Site Survey (Recce) — Recce 1
Status: SubmittedProject Execution Lifecycle — 18 Turnkey Stages
Interactive pipeline tracking from commercial estimate to final completion certificate
Basic Details
Project Scope
Client POC Details
Important Dates
Documents and attachments
| Sl.No | Document Name | Uploaded By | |
|---|---|---|---|
| 1. |
PDF
Land Agreement
|
A
Akash Parwani, 24 May, 2024
|
Project Users
Shared Organisations
Stage Deliverables
Location Evaluation
| Element Name & Description | Code & Category | Order Status | Item Type | Source | Status | Quantity | UOM | Draft Quantity |
Final Amount (₹)
|
||
|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
Filter Total | ||||||||||
|
HVAC
29
|
Section Total :
1,60,69,390
|
|
|||||||||
|
VRV Hi-wall units - 1.0 TR
Supply, installation, testing and commission... |
HVAC
CXEUPHOAC00352/1
|
Ordered 1 | Bought Out |
Proposal
EUPHO13632/7
|
Requested | 25 | nos. | 0 | 6,25,000 | ||
|
Copper refrigerant piping - Liquid lin...
Supply, installation, testing and commission... |
HVAC
CXEUPHOAC00355/1
|
Ordered 1 | Raw Material |
Proposal
EUPHO13632/7
|
Requested | 10 | Metric Ton | 0 | 30,000 | ||
|
10 HP ODU (Three phase) - critical lo...
Supply, installation, testing and commission... |
HVAC
CXEUPHOAC00351/1
|
Ordered 1 | Site Work |
Inc. Order
EUPHO13632/1
|
Confirmed
29 May, 2024
|
1 | nos. | 0 | 2,71,000 | ||
|
VRV Hi-wall units - 1.5 TR
Supply, installation, testing and commission... |
HVAC
CXEUPHOAC00353/1
|
Ordered 1 | Site Work |
Inc. Order
EUPHO13632/1
|
Confirmed
29 May, 2024
|
30 | nos. | 0 | 9,00,000 | ||
|
VRV Hi-wall units - 2.0 TR
Supply, installation, testing and commission... |
HVAC
CXEUPHOAC00354/1
|
Ordered 1 | Site Work |
Inc. Order
EUPHO13632/1
|
Confirmed
29 May, 2024
|
30 | nos. | 0 | 12,00,000 | ||
|
Copper refrigerant piping - Gas line ...
Supply, installation, testing and commission... |
HVAC
CXEUPHOAC00356/1
|
Ordered 1 | Site Work |
Inc. Order
EUPHO13632/1
|
Confirmed
29 May, 2024
|
12 | Metric Ton | 0 | 12,000 | ||
|
u-PVC Drain piping 25- 100mm dia
u-PVC Drain piping 25- 100mm dia Supply... |
HVAC
CXEUPHOAC00357/1
|
Ordered 1 | Site Work |
Inc. Order
EUPHO13632/1
|
Confirmed
29 May, 2024
|
60 | Metric Ton | 0 | 10,800 | ||
|
Constant Speed Inline Fan with AC ...
Location : Pantry Exhaust Supply, installatio... |
HVAC
CXEUPHOAC00358/1
|
Ordered 1 | Site Work |
Inc. Order
EUPHO13632/1
|
Confirmed
29 May, 2024
|
10 | nos. | 10 | 1,93,590 | ||
|
Second Floor Virtified tile flooring
1
|
Section Total :
1,25,000
|
||||||||||
|
XYZ
XYZ |
BMS
CXEUPHOBM00418/1
|
Yet to Order | - | - | Draft | 1 | Sq. Ft. | 0 | 1,25,000 | ||
|
FIRE FIGHTING
4
|
Section Total :
7,35,000
|
||||||||||
|
Fire Fighting (FF)
Supply, installation, testing and commissioning for... |
Fire Fighting
THCNUFF0306/1
|
Yet to Order | Site Work | - | Draft | 1 | nos. | 0 | 3,50,000 | ||
|
🚨
FIRE ALARM SYSTEM
Addressable Fire Alarm System - Smoke Detector ... |
Fire Fighting
THCNUFF0307/1
|
Yet to Order | Site Work | - | Draft | 1 | nos. | 0 | 1,80,000 | ||
|
🛡️
TASS & Rodent System
per SOW mentioned |
Fire Fighting
THCNUFF0308/1
|
Yet to Order | Site Work | - | Draft | 1 | nos. | 0 | 95,000 | ||
|
📢
PA SYSTEM
Amplifier with 10W Ceiling Speakers, Count of Spe... |
Fire Fighting
THCNUFF0309/1
|
Yet to Order | - | - | Draft | 1 | nos. | 0 | 1,10,000 | ||
1. Estimate — Back Office Costing & Quotation
₹9,00,00,000
Includes 18% GST₹6,44,00,000
71.5% of total budget28.4% (₹2.56 Cr)
Target Margin Met ✓v1.2 Final
Created by Back Office (Akash)Commercial Work Packages Breakdown
5 Major Trades| Work Package | Area / Units | Direct Cost (₹) | Markup (%) | Quoted Amount (₹) | Status |
|---|---|---|---|---|---|
| 1. Civil & Structural Masonry | 3,850 SQFT | ₹1,85,00,000 | 25% | ₹2,31,25,000 | Approved |
| 2. Millwork, Joinery & Modular Furniture | 18 Units | ₹2,45,00,000 | 30% | ₹3,18,50,000 | Approved |
| 3. MEP & Low Voltage Automation | Full Residence | ₹1,14,00,000 | 28% | ₹1,45,92,000 | Approved |
| 4. Flooring, Cladding & High-End Polish | 4,200 SQFT | ₹65,00,000 | 32% | ₹85,80,000 | Approved |
| 5. Soft Furnishing, Glass & Facade | Lump sum | ₹35,00,000 | 35% | ₹47,25,000 | Approved |
| Total Net Contract Value: | ₹9,00,00,000 | ||||
2. Client PO — Purchase Order & Contract Verification
Client Purchase Order Details
PO-EUPH-2024-881
Sanjay Srivastav Living Trust
18 May 2024
₹9,00,00,000
15% Advance, Milestones
12 Months (Turnkey)
Scope Alignment Checklist
Uploaded Document
Client_Signed_PO_Euphoria.pdf
4.2 MB • Uploaded on 18 May 20243. Advance — Payment Receipt & Ledger Entry
₹9,00,00,000
₹1,35,00,000
₹1,35,00,000
100% Cleared in Bank ✓Advance Transactions Log
Bank Reconciled| Transaction UTR / Ref | Payment Date | Mode & Bank | Milestone | Amount (₹) | Reconciliation |
|---|---|---|---|---|---|
| UTR-HDFC-991823019 | 20 May 2024 | RTGS • HDFC Bank | Initial Project Advance (10%) | ₹90,00,000 | Reconciled |
| UTR-ICIC-440182763 | 25 May 2024 | NEFT • ICICI Bank | Site Survey & Engineering Advance (5%) | ₹45,00,000 | Reconciled |
4. Layout from Client — Architectural CAD & Floor Plans
Floor Layout Plans
ARCH_LAYOUT_GF_REV3.DWG
3,850 SQFT • Layered CAD format with MEP conduits, structural beam drop dimensions & interior zoning
Layout Zoning Breakdown
6. Spec Drawing — Backoffice Millwork & Joinery Details
Joinery & Millwork Spec Packages (v1.2)
14 Detail Sheets Prepared| Drawing Code | Component Title | Room Location | Core Material & Finish | Hardware Specs | Status |
|---|---|---|---|---|---|
| DWG-EUPH-MBR-01 | Walk-in Wardrobe System (Fluted Glass) | Master Bedroom | 18mm BWP Plywood + Smoked Oak Veneer | Hafele Concealed Hinges & LED Sensors | Ready for Review |
| DWG-EUPH-KIT-02 | Modular Island Kitchen & Breakfast Counter | Kitchen | HDHMR Board + Merino Ultra-Matt Acrylic | Hettich InnoTech Soft-Close Slides | Ready for Review |
| DWG-EUPH-LIV-03 | Acoustic TV Media Wall & Floating Credenza | Living Room | MDF CNC Fluting + PU Champagne Polish | Blum Tip-On Push Catchers | Ready for Review |
7. Spec Drawing Approval — Client & Consultant Sign-Off
Official Approval Certificate
Sign-off authorizes factory BOM conversion and sheet cutting
Sanjay Srivastav
Digital Sign-off Stamp VerifiedAr. Rushal Sohal (Desqoo Design Studio)
Technical Quality Clearance Granted8. Create BOM — Bill of Materials & Factory Cutlist
340 Sheets
18mm & 12mm Calibrated180 Sheets
Merino High-Gloss & Smoked Oak520 Units
Hafele & Hettich Soft-close7.8% (Optimized)
CNC Nesting Algorithm ✓BOM Raw Materials List
Ready for Purchase Order Generation| Material Code | Description | Brand / Specification | Quantity | Est. Unit Rate (₹) | Total Est. Cost (₹) |
|---|---|---|---|---|---|
| RM-PLY-18MM | 18mm IS:710 BWP Marine Plywood | Century Club Prime 8x4 | 220 Sheets | ₹3,450 / sht | ₹7,59,000 |
| RM-LAM-MRL | 1mm High-Gloss Merino Laminate | Merino Matt Champagne 21081 | 110 Sheets | ₹1,850 / sht | ₹2,03,500 |
| RM-HAF-SLD | Matrix Box Slim Drawer Runners (500mm) | Hafele 35kg Soft-Close | 48 Pairs | ₹2,400 / pr | ₹1,15,200 |
10. Move to Purchase Dept — Estimate Amount & RFQ Comparison
₹9,00,00,000
₹6,44,00,000
₹6,28,40,000
₹15.6L Under Target Budget ✓11. Accounts Dept Approval — Budget & Payment Gatekeeper
Financial Audit & Authorization Summary
₹6,44,00,000
₹1,20,00,000
CFO / Accounts Lead
Stamped 30 May 202412. PO from Purchase Dept — Vendor Purchase Orders
| PO Number | Vendor Partner | Category | PO Value (₹) | Issue Date | Status |
|---|---|---|---|---|---|
| PO-DESQ-2024-101 | AAHIR ENGINEERS | ReadyMix & Civil | ₹4,66,690 | 01 Jun 2024 | Awarded |
| PO-DESQ-2024-102 | ROYAL PLYWOOD & HARDWARE | BWP Boards & Veneer | ₹4,92,400 | 02 Jun 2024 | Awarded |
| PO-DESQ-2024-103 | HAFELE INDIA PVT LTD | Architectural Hardware | ₹2,35,000 | 02 Jun 2024 | Awarded |
13. Send to Vendor — Committed Delivery Dates & Tracking
4 Active POs
Total ₹24.2 Lakhs Materials2 Shipments
ETA within 48 hours2 Delivered
GRN Inward Logged ✓11.4 Days
Under 14-day SLA limitActive Vendor Shipments & Committed Delivery Dates
Last synced just now| Vendor Partner | PO Reference | Committed Delivery Date | Lead Time | Logistics / AWB Ref | Dispatch Status | Actions |
|---|---|---|---|---|---|---|
| ROYAL PLYWOOD & HARDWARE Century Club Prime BWP Boards | PO-DESQ-2024-102 | 12 Jun 2024 | 10 Days | VRL-LOG-88192 | Delivered to Factory |
|
| HAFELE INDIA PVT LTD Matrix Box Slim Runners & Concealed Hinges | PO-DESQ-2024-103 | 15 Jun 2024 | 14 Days | BLR-HAF-99018 | In Transit (ETA Tomorrow) |
|
| MERINO LAMINATES LTD High-Gloss Champagne 21081 Acrylics | PO-DESQ-2024-104 | 18 Jun 2024 | 8 Days | SAFE-EXP-44109 | Dispatched from Plant |
|
14. Stock Receive Entry — Goods Received Note (GRN) & QA Check
| GRN Number | Inward Date | Item Received | Accepted Qty | Damaged / Rejected | Store Location | QC Status |
|---|---|---|---|---|---|---|
| GRN-2024-001 | 12 Jun 2024 | 18mm BWP Marine Plywood (Century) | 220 Sheets | 0 | Factory Bay 3 | Passed QC ✓ |
| GRN-2024-002 | 14 Jun 2024 | Merino Champagne High-Gloss Laminate | 108 Sheets | 2 Damaged (Claimed) | Factory Bay 1 | Partial QC Pass |
15. Factory Production — Machining, Assembly & Quality Control
75%
On Schedule18 Units
11 Carcases Assembled, 7 in CNC4 Stations
Beam Saw, Edgebander, Multi-Borer, Assembly4 / 5 Passed
Zero Critical Defects ✓Factory Production Line Stages & Machine Output
Live operational status across all 5 machining and assembly bays
1. Board Sizing
CNC Beam Saw Panel Cutting
2. Edge Banding
2mm Hot-Melt PVC Edge Tape
3. CNC Drilling
Multi-Boring & Minifix Grooves
4. Carcase Assembly
Joinery Dry-Fit, Dowels & Backs
5. Factory QC & Packing
Final Inspection & Barcode Tagging
Active Work Orders & Joinery Batch Cards
5 Work Orders| WO Number | Joinery Unit & Spec | Room Zone | Core Board & Finish | Assigned Machinist / Bay | Batch Status | Action |
|---|---|---|---|---|---|---|
| WO-EUPH-01 | Walk-in Wardrobe System (Fluted Glass & Oak) 4 Modular Carcases • Hafele Sensys Concealed | Master Bedroom | 18mm BWP Plywood + Smoked Oak | Mahesh Sharma (Bay 4 Assembly) | QC Passed ✓ | |
| WO-EUPH-02 | Modular Island Kitchen & Breakfast Counter 6 Base Carcases + 4 Wall Cabinets + Tandem Drawers | Kitchen | HDHMR + Merino Champagne Acrylic | Kailash Nath (Bay 4 Assembly) | Carcase Dry-Fit (70%) | |
| WO-EUPH-03 | Acoustic TV Media Wall & Floating Credenza CNC Fluted Paneling + Blum Push-to-Open | Living Room | MDF Fluting + PU Champagne Polish | Deepak Raj (Bay 3 CNC Station) | CNC Milling (85%) | |
| WO-EUPH-04 | Foyer Shoe Console & Full Partition Brass Trim Inlay + Beveled Mirror Glass | Foyer | 18mm Plywood + Brass T-Profiles | Sunil Yadav (Bay 4 Assembly) | QC Passed ✓ | |
| WO-EUPH-05 | Dining Bar Cabinet & Backlit Fluted Panels Wine Glass Racks + Profile LED Recesses | Dining Area | Toughened Glass + Marine Ply | Mahesh Sharma (Bay 3 CNC Station) | CNC Boring (60%) |
16. Despatch — Inventory Out, Delivery Challans & Gate Passes
2 Challans
14 Total Crates Dispatched1 Truck in Transit
ETA: Today, 03:30 PM at Site1 Delivered
Site Engineer Verified ✓100% Active
E-Way Bills Validated ✓Delivery Challans & Material Dispatch Register
Inventory-Out Logs| Challan Number | Dispatch Date | Items / Joinery Dispatched | Vehicle & Driver | Gate Pass Code | Dispatch Status | Actions |
|---|---|---|---|---|---|---|
| DC-EUPH-0881 | 14 Jun 2024 | Master Walk-in Wardrobe + Foyer Vanity 7 Wooden Crates • 1,250 Kgs • EWB-8819201948 | KA 04 MB 9102 (14 ft Truck) Driver: Manjunath (+91 98450 11928) | GP-90184-OK | Delivered at Site ✓ |
|
| DC-EUPH-0882 | 15 Jun 2024 | Modular Island Kitchen Base Carcases 7 Boxes + Hardware Packs • 980 Kgs • EWB-9901827610 | KA 02 AB 4419 (Eicher Pro) Driver: Chetan Kumar (+91 99018 44012) | GP-90185-IN | In-Transit to Site |
|
17. Site Installation — Labours Attendance, Check-in / Check-out & Snags
14 Active
4 Master Carpenters, 6 Polishers, 4 Helpers68%
On Schedule (Target: 17 May 2025)112 Hrs
Avg. 8.0 hrs / worker today3 Snags
1 Critical (Handle Alignment)Today's Site Labour Attendance Log
14 Sep 2024| Labour Name | Trade / Skill | Contractor | Check-in Time | Check-out Time | Hours Logged | Daily Wage | Status | Action |
|---|---|---|---|---|---|---|---|---|
|
RM
Ramesh Mondal
ID: LAB-0918
|
Master Carpenter (Joinery Lead) | Sharma Woodworks | 08:15 AM | — In Progress | 5.5 hrs | ₹1,200 / day | Clocked IN | |
|
SK
Sanjay Kumar
ID: LAB-0922
|
PU Polish & Lacquer Specialist | Apex Finishes | 08:30 AM | — In Progress | 5.2 hrs | ₹1,100 / day | Clocked IN | |
|
AK
Anil Kushwaha
ID: LAB-0935
|
Site Helper / Unloader | Sharma Woodworks | 08:00 AM | 01:30 PM | 5.5 hrs | ₹650 / half-day | Clocked OUT | Logged |
Installation Snagging & Quality Punch List
Middle panel door requires 2mm adjustment for perfect zero-gap flush finish.
Apply anti-fungal food-grade sealant along sink periphery.
18. Completion Certification — Project Handover & Warranty Sign-Off
Project Practical Completion & Client Handover
All 18 turnkey project stages completed: Backoffice Estimate, Client PO, Site Survey, CAD Specs, BOM & BOQ, Procurement, Factory Manufacturing, and Site Installation.
₹9,00,00,000
100% Invoiced & Settled ✓₹45,00,000
Authorized for Release100% Cleared
0 Open Defects★★★★★ (5.0)
Exceptional Turnkey ExecutionTurnkey Warranty Packages
Century Club Prime Calibrated IS:710 Marine Plywood
Soft-close concealed hinges, drawer slides & damper mechanisms
Free periodic maintenance checks and finish touch-ups
Final Retention Clearance & Handover Authorization
Client and Principal Architect have signed off on all room zones with 100% snag rectification. Authorizing payment unlocks the final handover receipt.